The project brought the site's waste water treatment plant (WWTP) into compliance.

Highlight: Work completed in a coastal environment, below sea level, without site closure. Construction work included a 5,200 m3 storm-water reservoir with a foundation on soil nails, a 2,500 m3 emergency overflow tank, an electric substation, sleepers and other engineering structures (foundations/sumps, etc.).

Contracting authority: INEOS ( PETROINEOS )
Project Management: De Viris / Guigues / Cira Concept