Linear infrastructures : Earthworks

A150 motorway

SEINE-MARITIME, FRANCE

For this turnkey design-build project for an 18.6 km stretch of motorway, including toll gate facilities, RAZEL-BEC was responsible for 1.8 m3 of rubble, 200,000 tonnes of bituminous material for the road surface, 10 standard engineering structures including a composite structure spanning 478 metres (the Austreberthe viaduct), a rest area, cross-lane toll barriers and a maintenance centre.

Highlight: Design-build work for the Fayat Group's very first motorway concession.

Contracting authority: ALBEA
Project management: Ingérop, RAZEL-BEC and NGE