Salazie upstream hydraulic tunnel

REUNION ISLAND

Construction of a hydraulic tunnel 18 km long with an inner diameter of 3.2 metres. A dedicated factory was set up to make the precast concrete segments for the inner lining. A double-shield TBM, 3.8 metres in diameter and 10 metres long, was used to excavate a tunnel 4,200 metres long with a cross section of 12 m². Conventional drilling and blasting was also used over a total length of 4,300 metres with a cross section 20 m².
Maximum overburden: 1,000 metres.

Highlight: Four aquifers crossed with water flow per aquifer reaching up to 1,200 L/s and 33 bars of pressure. Exceptionally difficult working conditions.
Aquifer crossed with a water flow of approximately 1,000 L/s and 20 bars of pressure. Exceptionally difficult working conditions.

Contracting authority: Réunion General Council
Project management: BRL - SCP - SECMO

Our references in Tunnelling